- Contact Person : Mr. liu jihou
- Company Name : Yuyao City Yuantuo Plastics Mould Co., Ltd.
- Tel : 86-574-22223785
- Fax : 86-574-22223785
- Address : Zhejiang,Yuyao,No.116Jinxing One Rd yuyao
- Country/Region : China
- Zip : 315400
Related Product Searches:Industry Mold,High Quality Industry Mold,Industry Mold
1. Industry Mold
2.Prompt Response3.Highest Quality4.Competitive prices
5.Moldbase:LYM,LKM DME HASCCO etc6.Mold steel:cavit ,core and slide:P20 2738 2136 718 H13 and available7.Material:ABS PP PS PA66 PMMA PS(PDA Certificate)
8.No.Cavities:Single/Multicavity
9.Mold life from 300,000 shots to 1 million times
10.Good polishing and surface texture
11.Ejection type:tripped plate,Ejector pin,Blade Pin
12.Injection type: Side Edge,Central Gate,Banana Gate,Submarin Gate
13.Cooling system:Water,Oil
14.Max size of mold:1500*1200mm
We are specialied in mould designing ,making &plastic parts'manufacture.
We own advanced equipment,such as CNC/EDM/Wire-Cutting/Milling Machine/Grinding Machine/Injection Machine.etc
We have a strong R&D center design system and strict inspection process in order to ensure the quality
Mould Manufacturing Process
Send 3D files for quotation (SpinFire reader) |
Receipt supplier quotation |
Send SOC(Schedule Of Condition) Part & SOC Mould |
Order |
Start Preliminary Drawing according SOC |
Check by clients |
Acceptation Preliminary Drawing |
Design Mould |
Validation Steel order with Clients |
Manufacturing |
Test T0 Test with RAW material according SOC Send photos of parts and mould |
Test T1 with Alpha 3D Team Send 7 parts by cavity to French Team (by Express -Fedex- DHL-UPS) Video with 2 cycle Times according to customer cycle time Send report of control of 5 parts per cavity Checking mould with check list (desassembly mould) |
Rework part according SOC part Rework mould according SOC mould Feedback from client project manager |
Test T2 according T1 Send 7 parts by cavity to French Team (by Air express - Fedex- DHL-UPS) Send report of control of 5 parts per cavity Acceptation part by client team |
Acceptation of Parts T2 |
Test T3 mould reception test with Alpha 3D team Send 7 parts by cavity to French Team (by Express -Fedex- DHL-UPS) Video with 2 cycle Times according to customer cycle time Send report of control of 5 parts per cavity RUN - 4hours mini - Acceptation mould |
T4 Starting Production |